13
‐‐‐‐‐‐‐‐‐90091Rev.1Mi niRaQ4GSecureSeries∙InstallationGuide
BH2019 16”x16”x¾”PlywoodInsert 1
BH2020 BrushCoverAccessPlate 2
BH2021 BackplatePouchw/Shelf 1
3. Installation
Installation and Setup
Be sure to follow hardware manufacturer’s recommended procedures for installing
equipment in the MiniRaQ 4G Secure.
Backplate Installation
For Stud Mount
Locate solid studs, 16” on center, before marking top
two locations for pilot holes. Drill .156” holes for #10
coarse screws (supplied) into the backplate slots,
spaced nominally at 16” at the top. Use the integrated
level to locate proper mounting pattern. When level,
tighten the first two screws, and then drill the
remaining locations; a minimum of 10 locations for full
payload rating of 400 pounds.
For Other Approved Surfaces
The same process should be used for installing to
other approved surfaces, using the ½” clearance
holes for toggle bolts into a ¾” plywood-backed wall
or fender washers and concrete tapping screws
(3/16” x 2-1/4” minimum) into cinder block.
2 Post Rack Mount
Designed for use in communication data centers and
telecommunication rooms, 2-Post Open Frame Racks
satisfy basic functional requirements for structuring
cable. The MiniRaQ 4G Secure is integrated with a 2
post rack-mount hole-pattern, which matches
industry standards for ease of installation.